This study examines the siting scenarios for renewable energy infrastructure (REI) in Switzerland, incorporating the external costs of ecosystem services and, innovatively, social preferences. This approach challenges the prevalent techno-economic siting paradigm, which often overlooks these externalities. To minimize the external costs of the scenarios while maximizing energy yield, Marxan, an optimization software, was employed.
MARXAN was run for 2 versions: a) without ground-mounted open space PV infrastructure (excl. OS) and b) with ground-mounted open space PV infrastructure (incl. OS). In each version optimization was done using ecological costs (ECUess) or social costs (ECUsoc) in a regular grid of 4x4km (planning unit).
File:
PU_data.shp: compressed Shapefile (ESRI) from the MARXAN optimization with 2216 rows (objects) and 18 columns (variables) with sf (simple feature) and data frame classes.
Headers are described below:
X01 = Planning_units (PUs)
X02 = incl.OS. number of times pu was selected in MARXAN when optimized for ecological costs
X03 = incl.OS. number of times pu was selected in MARXAN when optimized for social costs
X04 = incl.OS. ecological costs (ECUess) of pu when realizing the total energy (normalized)
X05 = incl.OS. social costs (ECUsoc) of pu when realizing the total energy (normalized)
X06 = incl.OS. total energy (MWh/a)
X07 = incl.OS. energy from roof-mounted PV infrastructure (MWh/a)
X08 = incl.OS. energy from wind turbines (MWh/a)
X09 = incl.OS. energy from ground-mounted PV infrastructure (MWh/a)
X10 = excl.OS. number of times pu was selected in MARXAN when optimized for ecological costs
X11 = excl.OS. number of times pu was selected in MARXAN when optimized for social costs
X12 = excl.OS. ecological costs (ECUess) of pu when realizing the total energy (normalized)
X13 = excl.OS. social costs (ECUsoc) of pu when realizing the total energy (normalized)
X14 = excl.OS. total energy (MWh/a)
X15 = excl.OS. energy from roof-mounted PV infrastructure (MWh/a)
X16 = excl.OS. energy from wind turbines (MWh/a)
X17 = excl.OS. energy from ground-mounted PV infrastructure (MWh/a)
geometry = Simple feature XY geometry (SFC_POINT) each representing the center of a 4x4km planning unit (PU) in EPSG 21781 (CRS CH1903 / LV03).
For MARXAN optimizations (for meaning of standard files in MARXAN see https://scholar.google.ch/scholar_url?url=https://courses.washington.edu/cfr590/software/Marxan1810/marxan_manual_1_8_2.pdf&hl=de&sa=X&ei=NAWHZI6JJ8PFmAGMo47oDQ&scisig=AGlGAw-DBrsV4kUzkR6GkN1jtG66&oi=scholarr), pu_data.shp was used to generate MARXAN files input.dat, pu.dat, puvfeat.dat, spec.dat.
Coordinate Reference System: CH1903 / LV03. EPSG: 21781.