Calculation models: The LT-bridge construction method for the material-saving and fast construction of post-tensioned concrete bridges

DOI

Calculation models behind the paper on the LT-bridge construction method for the material-saving and fast construction of post-tensioned concrete bridges (https://doi.org/10.1002/best.202400007).  The calculation models on the basis of which the formwork, reinforcement, and tendon plans were created are provided here.The .sofistik and .dwg files can be opened with the Sofistik 2022 software.The *.inc files can be opened with the INCA2 software (https://www.u-pfeiffer.de/inca2/inca2-09.html).If any further information is needed please contact franz.untermarzoner@tuwien.ac.at

Identifier
DOI https://doi.org/10.48436/wmb10-pw598
Related Identifier IsVersionOf https://doi.org/10.48436/bjhgw-a8236
Metadata Access https://researchdata.tuwien.ac.at/oai2d?verb=GetRecord&metadataPrefix=oai_datacite&identifier=oai:researchdata.tuwien.ac.at:wmb10-pw598
Provenance
Creator Untermarzoner, Franz
Publisher TU Wien
Publication Year 2024
Rights Creative Commons Attribution 4.0 International; https://creativecommons.org/licenses/by/4.0/legalcode
OpenAccess true
Contact tudata(at)tuwien.ac.at
Representation
Resource Type Dataset
Version 1.0.0
Discipline Other